For site owners
Land near gas production can host a power or compute pad.
Surface owners, ranchers and site controllers near producing wells or gathering lines are often the missing piece. A pad needs a few acres, a road in, a short fuel line and an owner who can sign. We screen your land against the requirements buyers bring to us and run the ownership from the county records.
You receive
- A site screen: surface and mineral ownership of record, leases, surface use agreements and easements that bear on a pad, and the access route.
- What a buyer would ask of the site, in plain terms.
- An introduction only if a qualified project fits and you agree.
- If a project goes ahead and you engage us: the land work on the surface lease and any ROW.
One pad, six layers of rights.
RightWho holds itWhat a pad needs
- Surfacethe surface ownera surface lease for the pad, the fuel line and the road
- Mineralsmineral owners of recordnothing new if leased; they are paid royalty on gas sold
- Oil and gas leasethe operator, as lesseefree use covers lease operations; a sale at your pad is a sale
- Surface use agreementoperator and surface owneroften limits pads to the lessee's own operations
- Gathering dedicationoperator and gatherermay decide whether gas can be sold at a pad at all
- Easements and accesswhoever owns each tract crossedROW for a line or road across another tract
The gas operator and the site owner are often different people.
A mineral lease lets the operator use the surface for its own oil and gas operations. A third party's generators or compute containers are a different use, so a pad usually needs a surface lease from you, and sometimes a consent under the operator's surface use agreement. That is landman work, and it is what we do.
For site owners
Describe your site
Two steps: your contact details, then the essentials. Unknowns are fine.
What to have ready
- Your relationship to the property.
- Where it is, at the precision you choose.
- Usable area with a unit, or Unknown.
- Road access, and wells, lines or power nearby if you know them.
- When it could be available.
After you send
- You see a reference number once the request is stored. Nothing is stored or shared before that.
- A person reads it and replies by email or phone with one or two questions. We do not ask you to sign anything to start.
- Nothing goes to anyone else without your permission, field by field.
- The first review is a reply and a preliminary screen: continue, hold or decline, with the reason. A qualification summary, a site screen or land work is scoped in writing, with its terms, before it starts. Sending creates no obligation for you or for us.