For power, compute and industrial buyers
Start with your requirements.
Fuel supply, usable power, location and operating tolerance belong in the same brief. Tell us what the project needs before we suggest a supply or site.
Describe the demand
- Intended use and target geography.
- Gas requirement with units, or the net power the equipment needs.
- Start date, operating term and interruption tolerance.
- Equipment fuel specification and delivery requirements, if known.
A generator rating is not the power available to the workload. Keep gross output, site loads and net requirements separate. We do not infer gas demand from a power figure alone.
Read the qualification guideI need gas
Tell us what you know.
Start with your contact details. Then give us the essentials. No documents needed.